| Cookieshouse.com |

Building Permit
|
Get
ready for the addition!
All pictures are clickable for x-large viewing.
|
| Before pictures: (July 31, 2002) |
| Front |
North Side |
South Side |
Back |
 |
 |
 |
 |
Day 1 (?)
Moving the electrical supply cable (July 31, 2002). Home Depot
run for insulation (24 rolls R-19) and xx-large tarp.
|
 |
I was safety
observing and could not take action photos during the actual move. |
 |
Watch that wire, it's a live one!
As safety observer, I strung the caution tape. |
Day 3 (?)
Dumpster arrival. Holly tree survived.
|
 |
 |
 |
 |
| Backing in |
Dumping a dumpster |
The surviving holly tree |
One person width from the house |
 |
Day 6,
Aug 5, 2002
So why is James picture here? And why is he holding a
paintball rifle? Well the roof did not come off the house as planned today.
Thunderstorms are in the forecast. For fun (not) the team decided to remove the
blown in insulation from the attic. Oh yeah. A whole day covered with recycled
paper dragged off to the dump in 50 gallon trash bags. |
 |
Day 6 (continued...)
James did have to drain his waterbed this morning though.
His room is looking awfully big without it. That reminds me, isn't that
really my waterbed? |
| Day 7 -- Aug 6, 2002 |
 |
The saws are lined up on the ridge line, ready
to get to work. |
 |
The roof is cut into big squares. I
guess it's not so hip to be a square after all. |
 |
There goes the first piece... |
 |
It better not rain now, all the 'puters are
under there! |
 |
Naked roof! |
 |
Eating away at the bones |
 |
Oh my! |
 |
2pm and the roof is all gone. |
 |
Time to empty the dumpster |
 |
Fresh lumber |
 |
The house is getting wrapped up
for the night. By 6pm, the team is gone. |
| Day 8 -- Aug 7, 2002 |
 |
Starting out the day with removing
the tarp. Wake up house, it's another long day. |
 |
Instant skylight. This is where the old
attic stairs were. It's covered by the end of the day. |
 |
Bored? So are these guys. All
lined up, just waiting to be decked. |
Day 9 -- Aug 8, 2002
The dumpster has been swapped, the decking is down, and the support for the back
door deck is in. PortaPotty delivered. |
 |
Day 10 -- Aug 9, 2002
Walls!!! |
 |
 |
 |
 |
| Ready... |
heave... |
ho... |
steady now.... |
 |
 |
 |
 |
| North wall done! |
South wall |
South wall |
South wall |
 |
 |
 |
 |
| Front wall |
back wall (south) |
back wall (south) |
back wall (north) |
Day 11 -- Aug 10, 2002
Opps! Deleted pics. |
Day 12 -- Aug 11, 2002
After mopping up the basement, the ceiling joists were installed. |
 |
 |
 |
 |
| Ceiling |
joists |
are up. |
With a view! |
| Day 13 -- Aug 12, 2002 |
 |
Lunchtime and the roof is lined up. |
 |
By the end of the day, the roof is on.
(see, it's dark inside) |
| Day 14 -- Aug 13, 2002 |
 |
Roof shingles are delivered. I'm too short to see the roof, so I don't
have any pics of it being installed. Front was completed today (Aug 13) the
back will be installed tomorrow (Aug 14). |
| Day 16 -- Aug 15, 2002 |
 |
With the roof done, our crime fighters start
on building the interior stairwell. (It's a crime for me to climb ladders.) |
 |
After a full day of knocking down walls, there
is a clear view from the second floor to the basement stairs. |
| Day 17 -- Aug 16, 2002 |
 |
Stairs! Just temporary, but I'll take 'um |
 |
The door... ah... French... nice and
bright. |
| Day 23 -- Aug 24, 2002 |
 |
James bathroom fixtures. Yeap, that's a
seat in his shower... |
 |
Here is my bath, minus the shower.
Nothing as special as James's seat... |
 |
Home Depot stopped by and dropped off these
beauties. |
 |
You wouldn't catch me dead on the
scaffolding. I guess that's why I'm not in construction. |